0102030405
High-Frequency Soft Welding Tube Ferrite Rod from China Suppliers - Quality Factory Manufacturing Equipment
Product Description
1. Main Components of a High-Frequency Welded Pipe Mill:
A Hf welding pipe mill machine mainly consists of the following parts: a high-frequency (coil), the steel tube to be welded, a ferrite rod (magnetic rod), squeeze rolls, and a water cooling system.
2. Working Principle of the High Frequency Ferrite Core:
Its operation follows a strictly electromagnetic induction principle: When high-frequency current flows through the induction coil, a high-frequency alternating magnetic field is generated. As a high-permeability magnetic path, the magnetic rod which is placed inside the pipe actively guides and concentrates the magnetic flux lines, focusing them precisely along the weld seam edges. At this location, strong eddy currents are induced by the dense magnetic flux, instantly generating heat sufficient to melt the metal. The squeeze rolls then apply pressure to finish the welding process.
3. Magnetic Permeability Requirements for the Magnetic Rod:
To effectively increase the magnetic flux in the induction coil, the magnetic rod must have a high magnetic permeability. Since permeability is a function of the magnetic field strength H, it is particularly required to be high within the range of magnetic fields used in the welding process. Because most welding machines operate under relatively low magnetic field strength, the initial permeability is typically used as a measure of this property.
When the alternating magnetic field generated by the coil becomes too strong, the magnetic rod can reach magnetic saturation. At this point, if the alternating magnetic field continues to increase, the magnetic rod will lose its efficiency for further increase. Therefore, for large-power pipe welding units, it is necessary to pay attention to using magnetic rods with high saturation flux density (also known as saturation magnetic induction strength).
Specification
| Initial permeability | 800±25% |
| Saturation magnetic flux density | ≧320mt |
| Core loss | 28-30mw/g |
| Curie temperature | ≦300℃ |
| Resistivity | 10^6 Ω/cm^2 |
| Material | Mn-Zn ferrite |
| Material density | 4.85g/cm3 |
| Grade | Mn-Zn ferrite |
| Delivery Time | within 7 days |
Temperature characteristics of magnetic permeability
Packing & Delivery
Frequently Asked Questions
What are the main components of a high-frequency welded pipe mill?
A high-frequency welded pipe mill machine mainly consists of a high-frequency induction coil, the steel tube to be welded, a ferrite rod (magnetic rod), squeeze rolls, and a water cooling system.
How does the high-frequency ferrite core work in the welding process?
It works by electromagnetic induction. When high-frequency current flows through the coil, it generates an alternating magnetic field. The high-permeability magnetic rod concentrates the magnetic flux lines along the weld seam edges, inducing strong eddy currents that melt the metal. The squeeze rolls then apply pressure to finish the weld.
Why is high magnetic permeability required for the magnetic rod?
High magnetic permeability is required to effectively increase the magnetic flux in the induction coil, specifically within the range of magnetic fields used during welding. Since most machines operate under relatively low magnetic field strength, initial permeability is a critical measure.
What happens when the magnetic rod reaches magnetic saturation?
If the alternating magnetic field becomes too strong, the magnetic rod reaches magnetic saturation and loses its efficiency to further increase the magnetic flux. For large-power pipe welding units, magnetic rods with high saturation flux density must be used.
What are the core material specifications of this Mn-Zn ferrite rod?
The Mn-Zn ferrite rod has an initial permeability of 800±25%, a saturation magnetic flux density of ≧320mt, a Curie temperature of ≦300℃, a core loss of 28-30mw/g, and a resistivity of 10^6 Ω/cm^2.
What is the delivery time for the Mn-Zn ferrite rods?
The standard delivery time for the Mn-Zn ferrite rods is within 7 days.
Inquire Now!
For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.








