0102030405
High-Quality Metal Slitting Machines Lines from China Suppliers - Reliable Factory Solutions
General Technical Requirements for Production Lines
The processing precision of the production line is in accordance with the relevant requirements of the “main technical parameters”. The seller is established on the basis of satisfying the buyer’s requirements and can make appropriate adjustments to the contents specified in the specification.
There is no abnormal vibration and noise for the product line and it should be in accordance with the requirements of the related state standards.
When hydraulic components and pressure station are normally operated and maintained according to Specifications, we make sure that it’s no leakage or natural damage. The replacement or maintenance should be supplied for the user in time.
Bead appearance of all the weld assemblies should be uniform in height and width. The connection between the weld assemblies and the parent metals should be transitioned smoothly. Getting rid of the splash and grinding are necessary to make the surface waviness nice and symmetry.
There is no crack, cold joint, slag inclusion, flame breakthrough, weld beading, undercut and air hole, etc. on the welded joint.
The appearance of the product line should be painted according to the user’s requirements.
Appearance of the paints: Oil film should be equal and there is no hanging stream, orange peel and pin-hole air bubble on it. Painting dressing surface shouldn’t show any trace of white.
Working Processing
Prepare coil
Loading coil
Uncoiling
Taking
Pinch
Hydraulic shear
Looper
Side Guide
Slitting
Scrap winding
Looper
Tail press
Separating
Tension
Feeding
Recoiling
Unloading
Capacity estimation table
-
Reliability:
The designing of machinery have high reliability, it can make sure about the equipment working normally and continuously. -
Safety:
The machines, hydraulic and electrical system of the whole line have reliable protection and safety device.The equipment have emergency cut-off function and response device, it can emergency stop by manual or automatically. -
Environmentally:
Kinds of hydraulic oils of the machine tools used must be recycled, avoid from leakage and environmental pollution. -
Energy-saving:
Consider the energy consumption factors when design the equipment, using the higher transfer efficiency unit, combining product accuracy improvement, reduce the consumption. -
Operation:
This equipment can operation easily, and man-machine interaction convenience. Details refer to the electrical system specification.
Capacity estimation table
| Capacity estimation table | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| NO | thickness | width | Coil length (Coil = 15t) | Slitting speed | Time to slitting the coil | Auxiliary time | Full time per coil | Annual working time fund | Annual productivity |
| mm | mm | m | m/min | m/min | min | min | Hour | ton | |
| ① | ② | ③ | ④ | ⑤ | ⑥ | ⑦ | ⑧ | ⑨ | ⑩ |
| 1 | 1 | 1250 | 1538.46 | 120 | 13 | 20 | 33 | 6000 | 163,636 |
| 2 | 2 | 1250 | 769.23 | 100 | 8 | 20 | 28 | 6000 | 192,857 |
| 3 | 3 | 1250 | 512.82 | 100 | 6 | 20 | 26 | 6000 | 207,692 |
| 4 | 4 | 1250 | 384.61 | 80 | 5 | 20 | 25 | 6000 | 216,000 |
| 5 | 5 | 1250 | 307.7 | 70 | 5 | 20 | 25 | 6000 | 216,000 |
Note:
1. The line operates 120 hours a week, i.e. 5 working days of 24 hours;
2. Auxiliary time is the preparatory and final time (time for installing and refilling the roll into the line and removing the roll from the winder, replacing cutting knives, etc.)
Calculation of annual production:
Line ⑥ = Line ④ ÷ Line ⑤
Line ⑦ = according to the Supplier
Line ⑧ = Line ⑥ + Line ⑦
Line ⑩ = Line ⑨ x 60 ÷ Line ⑧ x 15 tons
Motor configuration and power meter of main equipment of the unit
| NO | Name | Quantity | Motor power (KW) | Remark | |
|---|---|---|---|---|---|
| AC | DC | ||||
| 1 | Coil Car | 1 | 3 | Coil car moving | |
| 2 | Uncoiler | 1 | 30 | Uncoil power | |
| 3 | Material guiding machine | 1 | 55 | Working roll driving | |
| 4 | Slitting machine | 1 | 160 | Working roll driving | |
| 1 | 1.1 | Upper roll lifting | |||
| 1 | 0.75 | Arch forth and back | |||
| 5 | Scrap winder | 2 | 7.5 | Scrap power | |
| 6 | Recoiler | 1 | 200 | Recoil power | |
| 7 | Unloading car | 1 | 3 | Coil car moving | |
| 8 | Hydraulic system | 2 | 22 | Cylinder driving | |
| Total | ≈ 510 KW | Flexible design | |||
Frequently Asked Questions
What are the welding quality requirements for the production line structure?
All weld assemblies must feature uniform bead appearance in both height and width. The connection between the weld assemblies and parent metals must transition smoothly. The joint must be entirely free from defects such as cracks, cold joints, slag inclusion, flame breakthrough, weld beading, undercut, and air holes.
How is the annual productivity of the slitting line calculated?
Annual productivity is calculated using the formula: Annual working time fund (Hours) x 60 ÷ Full time per coil (minutes) x 15 tons. The full time per coil includes both the active slitting time and the auxiliary preparation time.
What safety and environmental measures are implemented in the line design?
The machinery, hydraulic, and electrical systems are equipped with reliable protection and safety devices, including manual and automatic emergency cut-off functions. Environmentally, all hydraulic oils must be recycled to prevent leakages and minimize pollution.
What does the auxiliary time in the capacity estimation include?
Auxiliary time (estimated at 20 minutes per cycle) accounts for preparatory and final operations, such as installing and refilling the coil into the line, removing the processed roll from the winder, and replacing cutting knives.
What is the total power requirement for the main equipment?
The total estimated power configuration of the main motors (including AC and DC units for the coil car, uncoiler, slitting machine, scrap winder, recoiler, and hydraulic system) is approximately 510 KW, designed with flexibility to match specific processing demands.
Inquire Now!
For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.


